Cheat code to open ever loading power automate run history

This time while I am writing this post, it is still a known issue with the Power Automate flow run history keep on stuck with the loading image. Many have already figured out a way to live with this issue. Here I am giving some tips on few ways that I am tackling it.

Cheat code 1 : Easy Peasy Lemon Squeezy, Click on the run history link, then while on the detail loading page, just click anywhere inside the browser window. This will work most of the time.

Cheat code 2 : Click on the run history link, then while on the detail loading page, MAXIMISE button twice to shrink and expand the browser window, this will load the run history without an issue.

Cheat code 3 : Click on the run history link, click the back arrow and then open it again. This will have multiple click involved. But if 1 and 2 didn’t work this is the last thing I have as solution.

When you find no solution to a problem, it’s probably not a problem to be solved but rather a truth to be accepted

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s